Furnace Re&Re + Add A/C


  • Removed mid-efficient furnace
  • Installed high-efficiency furnace
  • Added 2.5 Tonne A-Coil
  • Installed 2.0 Tonne Outdoor Unit
  • Concealed piping within joists pace to outside
  • Ran piping for:
    • Condensate
    • Lineset
    • Power
    • Communication
    • Venting
  • Replaced drywall, mudded, taped, and prepped for painting
  • Flex connector between furnace and house ducting system